Turning a Rental Around Without Losing Weeks
Make-ready is the work that gets a home back to rent-ready condition after a tenant leaves: touch-up or full paint, a deep clean, carpet cleaning or replacement, repairs from the move-out report, new filters and smoke detector batteries, and the small fixes that make a home photograph and show well. Done in the wrong order, it drags on. The painter waits on the drywall patch, the cleaner comes before the painter, and the carpet is cleaned twice.
We coordinate the trades in sequence, starting from the move-out inspection, and send you a scope with costs before work begins. Anything above your spending limit waits for your approval. Where a bigger upgrade would make sense, such as replacing tired carpet with hard-surface flooring in a well-used ranch, we raise it with the numbers, and you decide.
Make-ready is also the time to catch things that are hard to address while someone lives in the home: a water heater near the end of its life, a slow leak under a sink, or a crawl space vapor barrier that has come loose. Fixing those between tenants avoids an emergency call in the middle of a lease.
What Make-Ready Can Include
The scope depends on the move-out report and your budget.
Paint
Touch-ups or full repaints in durable, easy-to-match colors.
Cleaning
A full move-in clean, including appliances, cabinets, baths, and windows.
Flooring
Carpet cleaning, repairs, or replacement, often with hard-surface flooring in high-traffic rooms.
Repairs
Drywall, doors, blinds, fixtures, and anything else from the move-out report.
Safety Items
Smoke and carbon monoxide detectors tested, filters changed, locks rekeyed.
Curb Appeal
Yard cleanup, pressure washing, and gutter clearing before photos.
A Typical Turnover Sequence
| Order | Work | Why it comes here |
|---|---|---|
| 1 | Move-out inspection | Sets the scope and documents condition |
| 2 | Repairs and drywall | Must be done before paint |
| 3 | Paint | Before floors are cleaned or replaced |
| 4 | Flooring | After the messy work is done |
| 5 | Final clean and rekey | Last step before photos and showings |
Some steps can overlap on a simple turnover. Bigger jobs follow this order closely.
How We Run a Make-Ready
Scope from the inspection
The move-out report becomes a list of work with priorities.
Estimate and approval
You see costs before work starts, and anything above your limit waits for your OK.
Scheduled in sequence
Trades booked in the right order to avoid repeat visits.
Final check
The home is walked again, photographed, and handed to marketing.
Why It Matters
Shorter Vacancies
Work runs in sequence, so days are not lost waiting.
Costs Approved First
You see the scope and estimate before work begins.
Problems Caught Early
Aging systems are checked while the home is empty.
Ready for Photos
The home is ready to market the day work ends.
Make-Ready Services: Owner Questions
How long does a make-ready take?
A light turnover can take a few days. A full repaint with new flooring takes longer. You get a timeline with the scope.
Can I use my own contractor?
Usually, yes. We can coordinate around your vendor as long as they are properly insured and can meet the schedule.
Is the old tenant charged for any of this?
Only for damage beyond normal wear and tear that is documented in the move-out inspection, and only as the lease and Georgia law allow.